
Get in touch
Tell us about the job. Send pool or builder drawings if you have them.
Custom built platforms that lock the pool down and keep the build moving. Built on your pool, on the day, to fit any shape or size. Engineer designed and Form 15 certified.
Pool covers, pool void covers, pool lids, hard covers, platforms, working platforms, call them what you want. They were thought up and invented by the founder of Aus Fence Hire, Mr Jeff Smith, some 15 years ago. Many others have taken Jeff's invention and tried to imitate it, register trademarked names and pass off questionable designs. But if you want the original and the best, tried and tested by more pool builders, builders and homeowners than any other provider, then come and see Aus Fence Hire for your cover, void cover, lid or platform. All our platforms are rigorously engineered to the precise millimetre and kilonewton (mm and kN) for stability and safety, and our engineers constantly review our designs to make sure the best and most reliable materials are used to protect your pool.
Every unit is inspected and signed off before it leaves the yard, so what turns up on site is right the first time.
Every system carries its rated safe working load for each 1.2 metre section along the length of the pool. A longer pool simply gets more rated sections.
Which platform do you need? Give us a call and we will match it to your site.
Material checks, build checks and full traceability on every platform, so it meets and beats the Australian standards it needs to.
Every platform is designed to certified engineering specs, from the timber grade to the structure.


Want one on your pool? Give us a call.
Every step, on the job.

Tell us about the job. Send pool or builder drawings if you have them.

We work out the right system for your pool and send a price.

Approve the quote and we open your job file.

We line up the pool builder, site manager and install date, and get your engineering docs ready.

We visit, measure the void and check access, so it fits first time.

We build the platform on your pool, on the day, custom to its shape.

We lock it down and hand over your Form 15 engineering certificate.

When the build wraps up, we come back and pull it out.
Ready to start? Send us your drawings.
Our 450kg platforms are built to take a scaffold system on top.
Every platform is a trafficable work platform. The 450kg is our scaffold rated platform, ply sheeted. Our team checks every job.



Scaffold going up over the pool? Talk to us first.
Our platforms are designed and built to meet and beat the current Australian standards for pool safety and structural load. Every install comes with a Form 15 engineering certificate, the one your builder and site manager will ask for. Watch out for anyone offering a manufacturing certificate from a hardware retailer, site managers do not accept those.
Most pool builds need a fence and a platform at different stages. We do both, so it is one call and one team the whole way through.
Compliant panels and self closing gates, delivered and set up by our crew.
See fencingCustom built platforms rated to 110kg, 225kg and 450kg, built on your pool on the day.
The fence goes up the day the dig starts. Once the shell is in and set, we come back, put a platform on and remove the fence if required. The platform stays for the build. At handover we remove the platform and return the fence for as long as needed, until the permanent pool fence is installed and certified.
Need both? One call sorts the lot.
Our platforms are built from LVL bearers and joists. On concrete pools we use props for extra support. On fibreglass pools we use thicker LVL and no props, so the shell is never damaged. The top is sheeted in F17 form ply or Colorbond. Do not settle for inferior designs that buckle, bend and bow.
For fibreglass pools we can cover up to about 4.5m across, limited by transport. For concrete pools there is really nothing too big.
Concrete pools usually use a fence during the dig, then a platform. Fibreglass pools often need both. Give us a call and we will sort out which.
A platform will typically last 12 months easily before any warping or splitting of the ply. That is why we favour Colorbond, and unlike some suppliers we give you the choice of Colorbond or ply.
Anywhere from one hour to a few hours. Either way it is done in a day.
Each platform design, 110kg, 225kg and 450kg, has been engineered to the exact millimetre and kilonewton by our team of engineers, and each is built to hold well above its stated load for added safety.
[HOLD FOR ANNA SIGN OFF] There are clear guidelines for temporary pool fencing and gates, but these do not currently extend to platforms, so whether one is accepted comes down to the individual pool inspector. What we can tell you is that our platforms are safe and secure.
More questions? Call us, we answer 7 days.
Whether you are pouring the shell or finishing the deck, we have a platform that suits. Price beaten by 5%.